Sign in
The system capacity is near 1MW and built in the mushroom farm. 1MW. It’s planned from June, 2017 but delayed to start in September 2018 due to the complicated application of the green power facilities. However, it’s completed in one month only. In the project, the national top quality of high efficiency NSP Power module 310W was applied to match with the inverter produced by Delta Electronics;; the framework was coated with HAMAK anode 7μm and acrylic paint 7μm as anti-corrosive treatment was applied with the safety validation of structural engineer.